Codex work report · 2026-10-17 → 2026-10-24 EDT

IVR

Operational staging with explicit grants

Phase 10 · approval worksheet handoff

Verified access · separate refresh

AI Passport refresh · 2026-10-27

Retrieved: 2026-10-27T09:55:10-04:00 · America/New_York.

The original 2026-10-24 report stopped at an unapproved connector request. On 2026-10-27, Passport reports memory open, GitHub (private repos) linked, and an existing permanent pass for this app to read github-private / projects.items. Successful reads verify that access now works. No new grant, reconnect or settings change was required; the time the pass was approved is unknown.

The 14 conversation entries, archive flags, conclusions, next actions and local checkout snapshots below retain the original 2026-10-24 baseline. They were not reread for 2026-10-27. Use the separate Passport refresh for returned issue/PR states; reconcile historical next actions before resuming work.

These are bounded keyword-search results (up to 50 rows per query), filtered to the six report repositories and deduplicated by source URL. Some searches returned cross-repository matches and two repo-qualified searches returned no matches. Coverage is not exhaustive. Only titles, source URLs and open/closed states were returned: closed does not establish merged, and draft status, exact head, CI, reviews, releases and tags remain unverified by this refresh.

IVR · 21 returned items

The connector returned open project-sync issues #26/#27 and closed PR #12. This confirms item states only; it supplies no Phase 10 grant, staging evidence or provider acceptance.

Show returned issues and pull requests

Read the saved Passport evidence and query limits

Mission and next slice · historical baseline

Mission

Complete Phase 10 operational staging. Local service-log work is implemented; 14 live checks remain open, and no live Twilio staging is established.

Current milestone

The blocker handoff at 00905bf created PHASE10.md as DRAFT / NOT APPROVED. A prior graph review found a missing unconditional fallback; the later repair was recorded at 00905bf. The current supplied local head differs and the workspace is dirty.

Next slice

Populate and approve the Phase 10 grant, then rebase/reconcile the current dirty state and review the exact candidate head before staging.

Local checkout snapshot · historical baseline

Branch
igloo-default-ivr
HEAD
b119486
Worktree
Dirty: sibling ../talanov-igloo-ivr changes; ../voice-bridge untracked — preserve both
Upstream
0 ahead / 0 behind
Remote
https://github.com/ktalanov/igloonetworks.com

What can proceed

Local grant preparation and preservation/reconciliation work can proceed. Live staging and provider traffic remain blocked by the missing populated, approved grant. PR #13’s staging sequence is a conversation snapshot.

Conversations · newest first

2 root threads on this page
ACTIVEConcluded — blocker handoff

Phase 10 approval worksheet

The required grant was missing at 00905bf. Created PHASE10.md with DRAFT / NOT APPROVED status and handed off the explicit staging blocker. No live staging was performed.

ACTIVEConcluded — review only

Phase 10 feasibility review

Reported a P2 graph defect: the forward-call path lacked an unconditional fallback edge. A later repair was recorded at 00905bf; that historical fix does not verify the current head.

Scope and definitions. This report covers 2026-10-17 through 2026-10-24 in America/New_York (EDT). The overall report contains 14 root user-facing threads; subagent and review threads are folded into their parents. ACTIVE / ARCHIVED describes thread-store state, not project status. A thread is marked concluded according to its last assistant response; a review or blocker handoff may conclude without completing the project.

Local branch, head and worktree details are a point-in-time snapshot. Conversation evidence, local state and live GitHub status are separate; this page does not infer one from another.