Codex work report · 2026-10-17 → 2026-10-24 EDT

Dashdia

Daily project follow-through

0.2.11 selected · planning complete

Verified access · separate refresh

AI Passport refresh · 2026-10-27

Retrieved: 2026-10-27T09:55:10-04:00 · America/New_York.

The original 2026-10-24 report stopped at an unapproved connector request. On 2026-10-27, Passport reports memory open, GitHub (private repos) linked, and an existing permanent pass for this app to read github-private / projects.items. Successful reads verify that access now works. No new grant, reconnect or settings change was required; the time the pass was approved is unknown.

The 14 conversation entries, archive flags, conclusions, next actions and local checkout snapshots below retain the original 2026-10-24 baseline. They were not reread for 2026-10-27. Use the separate Passport refresh for returned issue/PR states; reconcile historical next actions before resuming work.

These are bounded keyword-search results (up to 50 rows per query), filtered to the six report repositories and deduplicated by source URL. Some searches returned cross-repository matches and two repo-qualified searches returned no matches. Coverage is not exhaustive. Only titles, source URLs and open/closed states were returned: closed does not establish merged, and draft status, exact head, CI, reviews, releases and tags remain unverified by this refresh.

Dashdia · 4 returned items

PR #4 is open and PR #3 is closed in the returned data. The connector does not expose draft or merged flags, so the original merge/draft descriptions remain historical conversation evidence.

Show returned issues and pull requests

Read the saved Passport evidence and query limits

Mission and next slice · historical baseline

Mission

Build toward the 0.2.0 product target. Current documentation still declares package version 0.1.0.

Current milestone

0.2.10 was recorded as merged in PR #3. The 0.2.11 plan and feasibility pass were frozen, with draft PR #4 recorded; product implementation had not begun.

Next slice

Continue the selected 0.2.11 slice within its agreed scope, then stop. 0.2.12 remains pending.

Local checkout snapshot · historical baseline

Branch
codex/business-assessments-0.2.11
HEAD
a13a068
Worktree
Clean
Upstream
0 ahead / 0 behind
Remote
https://github.com/ktalanov/dashdia

What can proceed

Local continuation can proceed within the selected 0.2.11 scope. The latest thread ended on a progress note, so it is not a completed delivery.

Conversations · newest first

3 root threads on this page
ARCHIVEDNot concluded

Documentation sync → 0.2.11 selection

Reconciled documentation, then selected 0.2.11. Conversation records cite merged PR #3 for 0.2.10 and draft PR #4 for the frozen 0.2.11 plan and feasibility pass. No product implementation was reported.

ACTIVEConcluded

0.2.8 daily Focus board

Delivered the daily Focus board flow. The closing response reported verification, independent review, and push completion.

ARCHIVEDNot concluded

0.2.4 import preview

The last assistant response was a progress note with reviewer work and UI delivery still pending. The current PLAN pauses 0.2.4; this thread does not establish a completed import-preview delivery.

Scope and definitions. This report covers 2026-10-17 through 2026-10-24 in America/New_York (EDT). The overall report contains 14 root user-facing threads; subagent and review threads are folded into their parents. ACTIVE / ARCHIVED describes thread-store state, not project status. A thread is marked concluded according to its last assistant response; a review or blocker handoff may conclude without completing the project.

Local branch, head and worktree details are a point-in-time snapshot. Conversation evidence, local state and live GitHub status are separate; this page does not infer one from another.