Documentation sync → 0.2.11 selection
Reconciled documentation, then selected 0.2.11. Conversation records cite merged PR #3 for 0.2.10 and draft PR #4 for the frozen 0.2.11 plan and feasibility pass. No product implementation was reported.
Codex work report · 2026-10-17 → 2026-10-24 EDT
Daily project follow-through
0.2.11 selected · planning completeVerified access · separate refresh
Retrieved: 2026-10-27T09:55:10-04:00 · America/New_York.
The original 2026-10-24 report stopped at an unapproved connector request. On 2026-10-27, Passport reports memory open, GitHub (private repos) linked, and an existing permanent pass for this app to read github-private / projects.items. Successful reads verify that access now works. No new grant, reconnect or settings change was required; the time the pass was approved is unknown.
The 14 conversation entries, archive flags, conclusions, next actions and local checkout snapshots below retain the original 2026-10-24 baseline. They were not reread for 2026-10-27. Use the separate Passport refresh for returned issue/PR states; reconcile historical next actions before resuming work.
These are bounded keyword-search results (up to 50 rows per query), filtered to the six report repositories and deduplicated by source URL. Some searches returned cross-repository matches and two repo-qualified searches returned no matches. Coverage is not exhaustive. Only titles, source URLs and open/closed states were returned: closed does not establish merged, and draft status, exact head, CI, reviews, releases and tags remain unverified by this refresh.
PR #4 is open and PR #3 is closed in the returned data. The connector does not expose draft or merged flags, so the original merge/draft descriptions remain historical conversation evidence.
Mission
Build toward the 0.2.0 product target. Current documentation still declares package version 0.1.0.
Current milestone
0.2.10 was recorded as merged in PR #3. The 0.2.11 plan and feasibility pass were frozen, with draft PR #4 recorded; product implementation had not begun.
Next slice
Continue the selected 0.2.11 slice within its agreed scope, then stop. 0.2.12 remains pending.
codex/business-assessments-0.2.11a13a068https://github.com/ktalanov/dashdiaWhat can proceed
Local continuation can proceed within the selected 0.2.11 scope. The latest thread ended on a progress note, so it is not a completed delivery.
Reconciled documentation, then selected 0.2.11. Conversation records cite merged PR #3 for 0.2.10 and draft PR #4 for the frozen 0.2.11 plan and feasibility pass. No product implementation was reported.
Delivered the daily Focus board flow. The closing response reported verification, independent review, and push completion.
The last assistant response was a progress note with reviewer work and UI delivery still pending. The current PLAN pauses 0.2.4; this thread does not establish a completed import-preview delivery.
Scope and definitions. This report covers 2026-10-17 through 2026-10-24 in America/New_York (EDT). The overall report contains 14 root user-facing threads; subagent and review threads are folded into their parents. ACTIVE / ARCHIVED describes thread-store state, not project status. A thread is marked concluded according to its last assistant response; a review or blocker handoff may conclude without completing the project.
Local branch, head and worktree details are a point-in-time snapshot. Conversation evidence, local state and live GitHub status are separate; this page does not infer one from another.