Start here / report map

A week of work.
One place to resume.

The Codex conversation review for 2026-10-17 through 2026-10-24. Start with the overview, then open a project for its context, recorded outcome and next useful action.

14 user-facing main threads7 project bucketsAmerica/New_York · EDT

01 / Begin with the full picture

Interactive activity overview

All fourteen conversations in latest-message order, with search, project filters, conclusion judgments, rough work-volume context and local checkout snapshots.

Open overview

Verified access · separate refresh

AI Passport refresh · 2026-10-27

Retrieved: 2026-10-27T09:55:10-04:00 · America/New_York.

The original 2026-10-24 report stopped at an unapproved connector request. On 2026-10-27, Passport reports memory open, GitHub (private repos) linked, and an existing permanent pass for this app to read github-private / projects.items. Successful reads verify that access now works. No new grant, reconnect or settings change was required; the time the pass was approved is unknown.

The 14 conversation entries, archive flags, conclusions, next actions and local checkout snapshots below retain the original 2026-10-24 baseline. They were not reread for 2026-10-27. Use the separate Passport refresh for returned issue/PR states; reconcile historical next actions before resuming work.

These are bounded keyword-search results (up to 50 rows per query), filtered to the six report repositories and deduplicated by source URL. Some searches returned cross-repository matches and two repo-qualified searches returned no matches. Coverage is not exhaustive. Only titles, source URLs and open/closed states were returned: closed does not establish merged, and draft status, exact head, CI, reviews, releases and tags remain unverified by this refresh.

Dashdia · 4 returned items

PR #4 is open and PR #3 is closed in the returned data. The connector does not expose draft or merged flags, so the original merge/draft descriptions remain historical conversation evidence.

Show returned issues and pull requests

Igloo v2 · 15 returned items

Later records include closed PR #13 (bounded notifications, briefs and release skills), closed PR #18 (4.3.2 documentation reconciliation), and closed issues #16/#17. The original 4.2.x next actions are historical and need reconciliation before reuse. Titles mentioning releases do not verify publication or tags.

Show returned issues and pull requests

Bark · 10 returned items

Later records include closed PR #7 (financial ledger, debug logging and a live five-model shootout) and closed documentation issues #8/#11/#12. The original planned comparison/install-guide next actions need reconciliation with these records; titles alone do not verify delivery or acceptance.

Show returned issues and pull requests

IVR · 21 returned items

The connector returned open project-sync issues #26/#27 and closed PR #12. This confirms item states only; it supplies no Phase 10 grant, staging evidence or provider acceptance.

Show returned issues and pull requests

Ortui · 19 returned items

PR #20 is open and issue #28 is open. Draft state, current head, CI and review outcomes were not returned. Original handoff details remain historical evidence.

Show returned issues and pull requests

AskAI · 0 returned items

The keyword query askai ran successfully and returned no matches. This does not prove the repository has no issues or pull requests.

Codex configuration · 0 returned items

This is a local configuration work stream with no GitHub repository inventory in scope.

Read the saved Passport evidence and query limits

03 / Choose a project

Seven project reports

Dashdia, Igloo v2 and Bark were the rough top three by recorded parent/delegated work volume, not elapsed time.

01 / 3 MAIN THREADS

Dashdia

Daily focus → business assessments. 0.2.10 delivered; 0.2.11 planned, with a draft PR and no product implementation.

Open Dashdia →
02 / 4 MAIN THREADS

Igloo v2

Release history, audit and skill design. Reconcile root files first; publish-only igloo-release remains proposed for 4.3.0.

Open Igloo v2 →
03 / 2 MAIN THREADS

Bark

Catalog/settings and release delivery. v0.2.0 publication read back in the conversation; comparison and install guidance remain planned.

Open Bark →
04 / 2 MAIN THREADS

IVR

Phase 10 feasibility and staging boundary. Approval worksheet is DRAFT / NOT APPROVED; live staging has not been accepted.

Open IVR →
05 / 1 MAIN THREAD

Ortui

PR #20 documentation handoff. Docs repaired and checked; PR #20 was open/draft in the conversation snapshot.

Open Ortui →
06 / 1 MAIN THREAD

AskAI

Shell alias cleanup. Alias removed and launchers verified; an existing shell may still need unalias askai.

Open AskAI →
07 / 1 MAIN THREAD

Codex config

Local agent policy. Explicit model/effort and bounded stall recovery added to local agent guidance.

Open Codex config →

Reading the report

State has two meanings

Active / Archived records the thread-store archive flag. It does not describe a project’s operational status.

Concluded / Not concluded describes the assistant’s last response or recorded state. An archived thread can be incomplete, and an active thread can have concluded.

Scope and privacy

Main conversations, folded context

The window covers local dates 2026-10-17 through 2026-10-24 inclusive, for Codex main threads active during the past seven days. Subagent and reviewer work is folded into its parent conversation.

No raw thread UUIDs or full transcripts are reproduced. Codex configuration is local only, with no GitHub inventory.