Human-Directed Engineering & Commercial Portfolio • 2026-10-20 → 2026-10-27
What did Talanov work on using Codex?
Seven-day synthesis of what Talanov designed, built, verified, and shipped using Codex across his 10 highest-potential commercial and highest-activity engineering projects between October 20 and October 27, 2026. Includes interactive Recent Work dropdowns, floating Changelog hover tooltips, self-contained Canvas telemetry charts, and a three-container 7-day GitHub/Git Changelog.
Top 10 Commercial & High-Velocity Projects
What did Talanov work on using Codex? — 10 Project Boxes
Each project box features a Recent Work (Oct 20 – Oct 27) dropdown and a Changelog ⓘ button to the right of Open <Project> → that opens an interactive hover/click popover summarizing PRs, Issues, and Commits.
Dashdia
0.2.8 Focus board, 0.2.9 Decision Workspaces, and 0.2.10 Report Library merged via PR #3 (21 comments); 0.2.11 staged in draft PR #4.
Recent Work (Oct 20 – Oct 27)
- Delivered 0.2.10 Report Library & manual evidence links via merged PR #3 (21 review/triage comments, SQLite schema 8 migration, 22-section export).
- Shipped 0.2.8 Daily Focus board and 0.2.9 Decision Workspaces with an explicit, reason-backed Freezer.
- Resolved narrow-layout wrapping defect UI010-001 for 64-character SHA-256 report hashes on 390px viewports.
- Verified standalone synthetic SQLite backup & recovery across all 24 database tables and binary BLOBs.
- Scoped 0.2.11 independent Business Attractiveness & Founder Compatibility assessment contract in draft PR #4.
Dashdia (Oct 20–27) Full 3-Box View →
- #2 OPEN docs: reconcile declared version and completed daily-board delivery
(3c)
a13a068(2026-10-24 00:25:20 -0400): docs: reconcile report delivery and scope assessment slicecacaefb(2026-10-24 00:10:46 -0400): feat: add report library and manual evidence links (0.2.10) (#3)bbd5bb3(2026-10-23 23:58:55 -0400): fix: wrap report history controls within narrow layoutsca075f2(2026-10-23 14:07:24 -0400): docs: reconcile report library implementation and acceptance- + 12 more commits in 7-day window…
IVR & Callvex
Merged PR #18 (+8,545 LOC unified 3-line IVR) & PR #25 (CLI auth/21610 fix); closed Issues #21–#24 (AMD voice callback, 3-turn SMS intake, Callvex 7-scenario stress suite).
Recent Work (Oct 20 – Oct 27)
- Merged PR #18 (+8,545 LOC across 45 files): Unified Twilio Serverless voice/SMS architecture across 3 phone numbers with 3 modes and ElevenLabs Voice Audition Studio.
- Delivered Outbound AMD Voice Follow-Up (Issue #21) and 3-Turn Conversational SMS Intake (Issue #22) powered by Gemma-4-31B summarization.
- Built Callvex Automated Telephony Adversarial Stress Engine (Issue #23): 7 Kokoro 82M acoustic attack scenarios verified with 0% system prompt leakage.
- Merged PR #25 & Issue #24: Fixed Twilio 21610 opt-out CLI handling, added stdlib HMAC-SHA1 X-Twilio-Signature auth to check-ladder.py, and migrated email alerts to Resend REST API.
- Established Dual Standing Sync Issues #26 (ivr/ Main Project) and #27 (talanov-igloo-ivr/ Internal Project) plus 10m/15m SLA escalation ladders.
IVR & Callvex (Oct 20–27) Full 3-Box View →
- #27 OPEN sync: talanov-igloo-ivr (internal project) - customer telephony, int
(0c) - #26 OPEN sync: ivr (main project) - administrator control plane & telephony w
(0c) - #24 CLOSED fix(scripts): Twilio 21610 opt-out error on text-lead and 403 auth o
(3c) - #23 CLOSED feat: Callvex automated telephony adversarial stress testing engine
(3c) - + 4 more issues on the project page…
d85fab9(2026-10-27 12:50:41 -0400): docs(reports): add comprehensive 27-10-2026 dark-tech dossier, fulabc3d2c(2026-10-26 13:18:13 -0400): docs: document dual sync issues and separate main vs internal IVRef25ebc(2026-10-25 06:32:38 -0400): docs(ivr): add comprehensive system overview and enforce email rou8bb86f7(2026-10-25 06:13:57 -0400): fix(notifications): replace local mail/esmtp with Resend API for l- + 20 more commits in 7-day window…
Bark
51 commits in 7 days! Merged PR #7 (v0.2.1 financial ledger & live 5-model USB mic shootout), closed 8 issues, and built 0.2.5 blind STT comparison suite (112 offline tests).
Recent Work (Oct 20 – Oct 27)
- Merged PR #7 (v0.2.1 / 0.2.2): User-owned financial ledger (LEDGER.md), structured debug logging, and a live 5-model physical USB microphone shootout ($0.0039 total verified spend).
- Completed Slice 0.2.5 STT Comparison & Benchmark Suite (commits 8817662b..de332201): Blind transcription comparison UI, deterministic noisy speech scoring, budget recovery CLI, and 112 passing offline tests.
- Authored Issue #10 RFC for Acoustic Sentry Mode (bark-sentry): Decibel-threshold intruder detection, PipeWire level monitoring, and Twilio SMS alert dispatch.
- Closed 8 GitHub issues (#1, #3, #5, #6, #8, #9, #11, #12) covering version hierarchy banners (v0.2.1-5), Fedora 44 compatibility, and cross-model sync automation (scripts/sync_issue.sh).
Bark (Oct 20–27) Full 3-Box View →
- PR #7 MERGED feat(financials): 0.2.1/0.2.2 user-owned financial ledger, debug log
(2c/0r)
- #12 CLOSED [Docs] Display explicit version hierarchy and minor patch provenance
(1c) - #11 CLOSED [Bugfix/Docs] Comprehensive Repository Documentation Audit & Synchro
(1c) - #10 OPEN [Feature Request] Acoustic Sentry Mode: Decibel-Threshold Intruder D
(1c) - #9 CLOSED [Docs] Synchronize project documentation, handoff state, and bump ve
(2c) - + 7 more issues on the project page…
de33220(2026-10-27 02:08:28 -0400): fix(stt): preserve exact numeric recovery evidence costs78e28a2(2026-10-27 01:35:30 -0400): docs(bark): record allowance and recovery status57f6ae4(2026-10-27 01:27:18 -0400): fix(stt): reconcile exact liabilities and guard paid dispatch88ed646(2026-10-27 01:26:01 -0400): fix(stt): disclose comparison budgets and reconcile exact billing- + 47 more commits in 7-day window…
Igloo v2
Merged 6 PRs (#7, #8 w/ 46 review items, #10, #13, #15, #18), closed 3 issues (#12, #16, #17), and shipped 46 commits culminating in v4.3.2 + Lush Forest / Midnight Observatory themes.
Recent Work (Oct 20 – Oct 27)
- Merged PR #18 (v4.3.2): Added authoring-stage syntax QA proofreading to igloo-create (#17) and overhauled README onboarding with copyable starter prompts (#16).
- Merged PR #13 (v4.3.0) & PR #15 (v4.3.1): Shipped bounded ntfy/Twilio notifications, recurring progress briefs with 60-day lifetimes, and publish-only igloo-release.
- Merged PR #8 (v4.2.0, 46 review comments) & PR #10 (v4.2.1): Delivered native cross-model GitHub issue sync between Codex and Antigravity, followed by security path-guard hardening.
- Merged PR #7 (v4.1.0): Standardized the 13-skill suite and CLI installation docs.
- Committed 06974f7 on main: Added Midnight Observatory (default) and Lush Forest themes to the portable report scaffold.
Igloo v2 (Oct 20–27) Full 3-Box View →
- PR #18 MERGED fix(docs): release 4.3.2 documentation reconciliation and syntax QA
(1c/0r) - PR #15 MERGED fix(notifications): restore approvable onboarding and recurring brie
(1c/0r) - PR #13 MERGED feat: add bounded notifications, briefs and release skills (4.3.0)
(1c/1r) - PR #10 MERGED fix(security): release 4.2.1 audit repairs
(2c/1r)
- #17 CLOSED fix(create): add authoring-stage syntax QA proofreading to igloo-cre
(2c) - #16 CLOSED docs: reconcile released 4.3.1, clarify the user journey, and archiv
(5c) - #14 OPEN [Deferred] perf: reduce bounded metadata discovery overhead without
(1c) - #12 CLOSED docs: correct 4.3.0 guide's description of status output
(0c) - + 2 more issues on the project page…
06974f7(2026-10-27 12:29:49 -0400): feat(report): add default and forest themes with migration plane3053a2(2026-10-27 00:46:13 -0400): Merge pull request #18 from ktalanov/codex/documentation-reconcilib0fe9ae(2026-10-27 00:42:56 -0400): chore(release): bump package revision to 4.3.2 and add release not0209ec2(2026-10-26 20:02:56 -0400): docs(plan): track cross-model sync receipts- + 42 more commits in 7-day window…
PingWing
Initialized full repo (25 commits) and tracked Flight N4-318 across 21 live comments in Issue #1; generated 8 Constructivist posters ($0.088) and dispatched Emails #08–#15 + Ghost Flight errata.
Recent Work (Oct 20 – Oct 27)
- Initialized PingWing aviation storytelling platform (14bc44d) and ran live multi-stage broadcasts (Emails #08–#15) for Flight N4-318.
- Generated 8 Soviet Constructivist regional banners (Kemerovo, Arkhangelsk, Lake Onega, Vologda/Totma, St. Petersburg) with full cost ledger ($0.088 total).
- Implemented T-3min Russian factual flight verification daemon (091550a) checking runway 10L (3,397m), tailwinds, and destination weather.
- Resolved the 'Ghost Flight' timezone scrambling incident via live Resend dispatches of ERRATA #999, ERRATA #1000 (Toaster Confession), and Asimov Three Laws penance essays (50c6326).
PingWing (Oct 20–27) Full 3-Box View →
- No PRs opened/updated Oct 20–27 (work committed directly or prior window).
- #1 OPEN [First Flight] Tracking I4-318 -- Ping Wing's first flight
(21c)
50c6326(2026-10-27 11:29:06 -0400): feat(email-v5): add English translation senders for penance and to4617a24(2026-10-27 02:11:10 -0400): feat(email-v5): add Asimov three laws philosophical penance essay9dffecb(2026-10-27 02:03:41 -0400): feat(email-v5): add and broadcast apology part 2 (toaster dumbass2e775ab(2026-10-27 01:37:43 -0400): feat(email-v5): add and dispatch corporate apology email for ghost- + 21 more commits in 7-day window…
JustTheTips
Merged PR #9 (v0.16.0 high-frequency 60s telemetry ingestion & collapsible sidebar), closed 8 of 9 issues (#1, #3–#8, #10), and shipped 19 commits across v0.14.0–v0.16.0.
Recent Work (Oct 20 – Oct 27)
- Merged PR #9 (v0.16.0): Built 60-second SQLite telemetry ingestion pipeline (scripts/ingest_swapinfo.py) and 5-resolution Chart.js deck (1m, 5m, 15m, 1h, 30d).
- Implemented collapsible sidebar category navigation (#8) with item count badges and automatic search-query expansion (67/67 smoke tests passing).
- Delivered v0.15.0 Twilio Master Reference (TIPS_TWILIO.md & TIPS_TWILIO_SKILLS.md) and v0.14.0 Google Cloud Free-Tier architecture guide.
- Consolidated OpenRouter model systemd timers (#1), added nightly Taskboard report automation (v0.15.1), and refined dashboard hardware specs (#3, #4, #5).
JustTheTips (Oct 20–27) Full 3-Box View →
- PR #9 MERGED feat(v0.16.0): High-Frequency Telemetry Ingestion & Collapsible Side
(1c/0r)
- #10 CLOSED [Handoff Ledger] [MVP] v0.16.0 High-Frequency Telemetry Ingestion, M
(2c) - #8 CLOSED [Feature Request] Collapsible Sidebar Categories with Default-Collap
(0c) - #7 CLOSED [Feature Request] High-Frequency 60s Telemetry Ingestion Pipeline &
(0c) - #6 CLOSED [Handoff Ledger] [MVP] v0.15.0 Twilio Programmable Telephony, Voice,
(3c) - + 5 more issues on the project page…
5f1dcdd(2026-10-25 02:41:18 -0400): Merge pull request #9 from ktalanov/feat/v0.16.0-telemetry-and-sid7a8e058(2026-10-25 02:40:41 -0400): build(site): compile static html for v0.16.0 releasedd5860c(2026-10-25 02:40:34 -0400): feat(telemetry): high-frequency 60s ingestion & collapsible sidebab436231(2026-10-25 01:08:56 -0400): build(site): compile static tip pages and retain daily model snaps- + 15 more commits in 7-day window…
Ortui
Completed PR #20 documentation & attribution repair at 7aacb2d (64 total PR comments, passing CI & dual Spec/Standards reviews) for the v0.6.0 Account Dashboard & Go SDK candidate.
Recent Work (Oct 20 – Oct 27)
- Repaired PR #20 lifecycle attribution (ATTR-DOC-01) and stale acceptance status (STD-DOC-01) at commit 7aacb2d (Issue #28).
- Integrated interactive Terminal Account Dashboard (ortui account / F5) displaying Credits, Models, and Activity with foreground paste routing.
- Enforced strict credential role isolation (--management-key / OPENROUTER_MANAGEMENT_KEY) so account telemetry never reuses chat inference keys.
- Migrated backend adapters to the official Go Client SDK v0.9.61 with bounded reads and an opt-in read-only catalog lookup tool ($0.10 cost guard).
Ortui (Oct 20–27) Full 3-Box View →
- PR #20 DRAFT feat: integrate account dashboard and Client SDK catalog mode
(64c/0r)
- #28 OPEN fix(docs): repair PR20 attribution and stale acceptance status
(1c)
7aacb2d(2026-10-20 15:10:37 -0400): docs: restore SDK implementation PR reference
Igloo-Notify & Halp
Merged PR #4 (single-shot relay deadlock fix) and PR #6 (elevated prompt options, verbatim SMS chat echoing & credential screening); closed all 4 issues (#1–#3, #5) + added GCP/Gemini cost SMS in halp.
Recent Work (Oct 20 – Oct 27)
- Merged PR #6 (5 comments, 1 Codex review): Added elevated input prompt options, verbatim chat echoing ('**User SMS received:**'), subject auto-acks, and credential screening.
- Merged PR #4 (1 comment, 2 Codex reviews): Fixed unattended background daemon ingestion deadlock by introducing single-shot relay mode (--once).
- Released v0.3.0 (040559a) and closed Issues #1, #2, #3, and #5 covering base62 topic entropy, 5-minute interactive timeouts, and sudo desktop guardrails.
- Added automated daily Twilio, OpenRouter, and Google Cloud/Gemini credit SMS cost notifier in halp (commits bf004cb & e3ce443).
Igloo-Notify & Halp (Oct 20–27) Full 3-Box View →
- #5 CLOSED feat(bridge): elevated input prompt options, verbatim chat echoing,
(0c) - #3 CLOSED fix(bridge): resolve unattended message ingestion deadlock in backgr
(0c) - #2 CLOSED feat(bridge): 5-minute interactive prompt timeout, zero-token audit,
(1c) - #1 CLOSED feat(notify): dynamic topic generation, entropy calculations, and ve
(1c)
80d68b9(2026-10-26T20:01:54Z): Merge pull request #6 from ktalanov/feat/elevated-input-prompts-an40af184(2026-10-26T20:01:17Z): fix(bridge): screen sensitive credentials in receipts and enforce6c9c30c(2026-10-26T19:46:30Z): feat(bridge): elevated input prompt options, verbatim chat echoingfcb1be8(2026-10-26T19:40:16Z): Merge pull request #4 from ktalanov/fix/single-shot-bridge-listene- + 8 more commits in 7-day window…
Talanov.ca
Merged PR #11 ('Rewrite the site in Talanov’s documented voice', 4 comments) and committed 6f97b4c on Oct 24 updating Homepage/About copy, staging candidate replacement copy, and pruning 700+ lines of stale docs.
Recent Work (Oct 20 – Oct 27)
- Merged PR #11 (Oct 20, 4 comments): Established canonical voice rulebooks (TALANOV-CORE.md, TALANOV-PERSONAL.md, TALANOV-BUSINESS.md) and page-by-page copy rewrite.
- Committed 6f97b4c (Oct 24): Updated Homepage and About page with sharper personal copy and pruned 700+ lines of deprecated backup/report files.
- Staged full candidate copy replacement in tmp/candidate-for-site-copy-replacement.html.
- Authored interactive site reboot specification (a_new_site.md) featuring 90s dial-up waterfall, BSOD transition, and Gentoo/VT100 terminal experience.
Talanov.ca (Oct 20–27) Full 3-Box View →
- PR #11 MERGED Rewrite the site in Talanov’s documented voice
(4c/0r)
- No GitHub issues updated Oct 20–27.
6f97b4c(2026-10-24 10:57:19 -0400): feat: update personal site copy and prune obsolete documentation
AskAI
Concluded the Oct 20 shell alias cleanup thread so askai and ,askai invoke the v0.1.0 Charm Gum launcher cleanly without shell interception; v0.2.0 dynamic OpenRouter catalog is next.
Recent Work (Oct 20 – Oct 27)
- Concluded Oct 20 Codex thread removing the conflicting askai shell alias and verifying both askai and ,askai launchers.
- Maintained stable v0.1.0 Charm Gum 5-step interactive wizard across agy, codex, ori, and crush harnesses.
- Preserved existing local CONVOS.md and .ori/ worktree state without unintended mutations.
AskAI (Oct 20–27) Full 3-Box View →
- No PRs opened/updated Oct 20–27 (work committed directly or prior window).
- No GitHub issues updated Oct 20–27.
- 2026-10-20 10:30 EDT: Concluded shell alias removal and launcher verificati
Interactive Telemetry & Portfolio Charts
7-Day Engineering Velocity & Commercial Viability Matrix
Offline HTML5 Canvas charts visualizing Oct 20–27 commit/issue/PR volume per project, commercial viability vs. activity positioning, and daily execution cadence.
1. 10-Project Activity Volume (Oct 20–27)
Commits (emerald), GitHub Issues (gold), and Pull Requests (sky) per project.
2. Commercial Viability vs. Engineering Activity
Bubble size = 7-day commit volume. Top-right quadrant = flagship commercial focus.
3. Daily Commits & Codex Sessions (Oct 20–27)
Daily commit bars paired with user-directed main Codex threads across the 8-day span.
Master 7-Day Activity Ledger (2026-10-20 → 2026-10-27)
Changelog Across All 10 Projects (PRs, Issues & Commits)
Unified three-container Changelog aggregating all 16 Pull Requests, 41 GitHub Issues, and 195 Git Commits across Talanov's 10 core projects between October 20 and October 27, 2026.
1. Pull Requests (Oct 20–27)
16 PRs (14 Merged, 2 Open)Merged v4.3.2 release reconciling documentation (#16) and adding authoring-stage syntax QA proofreading to igloo-create (#17) (1 automated review comment).
Merged feat(bridge): Added two-stage input scope onboarding, verbatim chat echoing, standardized subject auto-acknowledgments, and credential screening in receipts (5 comments, 1 Codex review).
Merged fix(bridge): Resolved unattended message ingestion deadlock in turn-based agent harnesses by adding --once single-shot relay mode (1 comment, 2 Codex reviews).
Merged fix resolving Twilio 21610 opt-out CLI errors (--from override & STOP/START guidance) and HTTP 403 errors on check-ladder.py via stdlib HMAC-SHA1 X-Twilio-Signature computation (1 review comment, 4 files +191/-13).
Merged v4.3.1 patch restoring approvable onboarding, immutable 60-day notification lifetimes, and current-period recurring brief selection (1 comment).
Merged v4.3.0 adding bounded notifications, recurring briefs, and release preparation skills (1 comment, 1 formal review).
Merged v0.16.0 implementing 60s swapinfo-to-SQLite telemetry ingestion, multi-scale 5-resolution Chart.js views, and collapsible sidebar categories with search auto-expansion (1 comment, 67 passing smoke tests).
Merged v0.2.1/0.2.2 introducing the user-owned financial ledger (LEDGER.md), debug logging, and live 5-model STT shootout on physical USB microphone hardware (2 review comments confirming combined Spec & Standards pass).
Draft PR establishing the frozen plan and feasibility contract for slice 0.2.11: private founder profiles, separate weighted BA & founder fit scores, and isolated stale-aware sales scenarios (2 overview/contract comments).
Merged 0.2.10 Report Library with canonical root scanning, exact-byte preview/cancel/apply leases, schema 8 migration, and manual evidence linking. Its 21 comments tracked UI010-001 narrow-layout button wrapping fixes, dual Spec/Standards passes, and 24-table synthetic recovery verification.
Merged v4.2.1 security audit repairs hardening file path confinement and shell argument handling in sync helpers (2 comments, 1 review).
Merged unified Twilio Serverless voice and SMS platform (+8,545 LOC across 45 files) supporting +1 365, +1 437, and +1 888 lines, 3 routing modes, screened voicemail, and Voice Audition Studio (5 comments, 1 formal review).
Merged v4.2.0 native cross-model GitHub issue synchronization enabling Codex and Antigravity to coordinate state (4 comments, 46 review threads).
Open/frozen v0.6.0 candidate integrating the terminal Account Dashboard (Credits, Models, Activity), management-key isolation, and official Go Client SDK v0.9.61 catalog mode. Accumulated 64 comments across multi-slice implementation, CI runs, dual Spec/Standards reviews, and attribution reconciliation at 7aacb2d.
Merged foundational rewrite of talanov.ca in Talanov's documented voice, splitting voice rules into TALANOV-CORE.md, TALANOV-PERSONAL.md, and TALANOV-BUSINESS.md with explicit approval gates (4 comments).
Merged v4.1.0 release packaging 13 skills, risk-based review cadence, and CLI installation guides (4 comments).
2. GitHub Issues (Oct 20–27)
41 Issues (28 Closed, 13 Open)Closed in PR #18: Added authoring-stage syntax QA proofreading to igloo-create to prevent malformed markdown/number joins (2 comments).
Closed in PR #18: Reconciled released 4.3.1 docs, clarified newcomer user journey, and archived stale sync guidance (5 comments).
Open (Deferred): Reduce bounded metadata discovery overhead without weakening read path guards (1 comment).
Open: Active Cross-Model State Synchronization & Milestone Tracking ledger between Antigravity and Codex (14 comments).
Open master live flight ledger: '[First Flight] Tracking I4-318 -- Ping Wing's first flight' with 21 real-time operational comments logging Resend delivery IDs, Constructivist poster generations, and Ghost Flight retraction dispatches.
Open standing sync ledger for talanov-igloo-ivr (internal studio telephony, 3-turn SMS intake, 10m/15m SLA ladder, Resend API).
Open standing sync ledger for ivr/ (main commercial Astro 7 SSR control plane & 9-stage trust chain).
Closed in PR #6: Elevated input prompt options, verbatim chat echoing, and subject acknowledgments.
Closed in PR #4: Resolved unattended message ingestion deadlock in background daemons.
Closed: Enforced 5-minute (300s) interactive prompt timeout, zero-token audit, and sudo privilege guardrails (1 comment).
Closed: Delivered dynamic topic generation, base62 entropy calculations, and verified mobile handshake (1 comment).
Closed via PR #25: Resolved Twilio 21610 opt-out error on text-lead.py and 403 auth on check-ladder.py (3 comments, 37/37 unit tests).
Closed: Delivered Callvex automated telephony adversarial stress testing engine with 7 Kokoro 82M attack scenarios (3 comments).
Closed: Delivered v0.4.0 conversational outbound 3-turn SMS lead intake with 300s Sync TTL & Gemma-4-31B summarizer (3 comments).
Open: 'Glacier Line' voice-bridge v0.1.0 pre-alpha agent handoff prompt & SemVer roadmap to v1.0.0 MVP.
Closed: Added explicit version hierarchy banner and minor patch provenance (v0.2.1-1..5) in README.md (1 comment).
Closed in PR #13/15: Corrected 4.3.0 guide's description of status output.
Closed: Comprehensive repository documentation audit & cross-model sync script verification (1 comment).
Closed: v0.16.0 MVP Handoff Ledger documenting SQLite schema, point-budgeting math (~11.5px spacing), and verification (2 comments).
Closed in PR #9: Collapsible sidebar categories with default-collapsed state and search auto-expansion.
Closed in PR #9: High-frequency 60s telemetry ingestion pipeline & multi-scale dashboard charts.
Closed: v0.15.0 Twilio Programmable Telephony, Voice, SMS & Cloud Architecture handoff ledger (3 comments).
Closed: Refined top stat-grid layout and unbolded typography for visual hierarchy (2 comments).
Closed: Corrected workstation RAM capacity badge to 16G (1 comment).
Closed: Corrected workstation CPU model badge to Intel Core i5-11320H (1 comment).
Open: Standing Cross-Model State Synchronization & Antigravity Operations Ledger (5 comments).
Closed: Delivered v0.3.0 outbound lead follow-up voice IVR with Twilio AMD, voicemail recording & Gemma-4-31B summarizer (3 comments).
Open: Mark superseded sync issues with [CLOSED BY MODEL] suffix and support doc/build/development labels.
Open RFC: Acoustic Sentry Mode (bark-sentry) for decibel-threshold intruder detection, SMS alerting & remote evidence offload (1 comment).
Closed: Synchronized project documentation, handoff state, and bumped version to 0.2.1-2 (2 comments).
Closed: Updated v0.2.1 installation instructions and Fedora 44 / XFCE 4.20 compatibility.
Closed: v0.2.x Implementation Ledger — 0.2.2 Financials & Debugging Complete (5 comments).
Closed: v0.2.2 Planning, Testing Budget ($0.001/req), and Financial Ledger (3 comments).
Open: Standing Development Paid Endpoint & Testing Cost Ledger ($0.0039 shootout total across 2 comments).
Closed: Pre-MVP v0.2.0 OpenRouter catalog, settings and usable desktop guide ledger (15 comments).
Closed: Release 0.1.0 pre-MVP Ephemeral RAM Audio Recording & Standalone GTK Alpha (8 comments).
Closed: Consolidated OpenRouter model pipelines to JTT and purged dangling systemd units.
Open: Forensic weekly telephony, voice recordings & messaging cost audit ($0.9999 total across 10 calls, 37 SMS, 27 Polly turns).
Open documentation tracking issue reconciling declared package.json version (0.1.0) with delivered planning slices 0.2.1–0.2.8 (3 comments).
Open: Respect selected custom output directory in report hub labels.
Open tracking issue: 'fix(docs): repair PR20 attribution and stale acceptance status' — verified at commit 7aacb2d and awaiting PR #20 merge (1 comment).
3. Commits & Changelogs (Oct 20–27)
195 CommitsAdded selected-root Report Library (0.2.10) with SHA-256 snapshot hashing, schema 8 migration, and 22-section export envelope.
Merged PR #18 & PR #25: Full Twilio Serverless multi-line IVR deployment, HMAC-SHA1 CLI signature authentication, and Resend API email dispatch.
Merged PR #7: Released v0.2.1 with user-owned LEDGER.md financial tracking and live 5-model USB microphone shootout.
Released v4.3.2 (PR #18), v4.3.1 (PR #15), and v4.3.0 (PR #13): Bounded notifications, recurring briefs, igloo-release, and syntax QA.
Launched PingWing core storytelling pipeline and dual-clock (EDT/KEJ/MSK) HTML email engine (14bc44d..3b2b544).
Merged PR #9 (v0.16.0): High-frequency 60s telemetry SQLite pipeline, 5-scale Chart.js deck, and collapsible sidebar categories.
Committed 7aacb2d on codex/ortui-parallel-slices restoring SDK implementation PR references and reconciling PR #20 review attribution.
Merged PR #6 (80d68b9) & PR #4 (fcb1be8) in ktalanov/igloo-notify: Single-shot relay mode, verbatim chat echoing, and credential screening.
Merged PR #11 (2026-10-20): Modular voice governance and complete site copy rewrite.
2026-10-20 10:30 EDT: Concluded shell alias removal and launcher verification in Codex session; application baseline remains at 91efffa (v0.1.0).
d85fab9 docs(reports): add comprehensive 27-10-2026 dark-tech dossier, full GitHub changelog (#1-#27), Chart.js visuals, and index.html symlink
2026-10-27 12:50:41 -0400
06974f7 feat(report): add default and forest themes with migration plan
2026-10-27 12:29:49 -0400
50c6326 feat(email-v5): add English translation senders for penance and toaster confession
2026-10-27 11:29:06 -0400
4617a24 feat(email-v5): add Asimov three laws philosophical penance essay
2026-10-27 02:11:10 -0400
9dffecb feat(email-v5): add and broadcast apology part 2 (toaster dumbass edition)
2026-10-27 02:03:41 -0400
2e775ab feat(email-v5): add and dispatch corporate apology email for ghost flight N4-318
2026-10-27 01:37:43 -0400
5fb25c1 fix(flight-suite): harmonize emails 16-19 with verified 08:52 MSK landing, runway 10L (3,397m) correction, and engaging tone
2026-10-27 01:12:06 -0400
3b2b544 feat(broadcast): dispatch Email #15 with verified Russian flight facts and tailwind timing update
2026-10-27 01:06:42 -0400
091550a feat(monitor): implement Russian factual flight verification daemon running at T-3min
2026-10-27 00:54:56 -0400
a9be36b docs(cost): finalize OpenRouter image generation ledger with all 8 requests
2026-10-27 00:47:24 -0400
e3053a2 Merge pull request #18 from ktalanov/codex/documentation-reconciliation
2026-10-27 00:46:13 -0400
cf8f326 feat(art): add Saint Petersburg arrival constructivist poster and update image ledger
2026-10-27 00:44:20 -0400
b0fe9ae chore(release): bump package revision to 4.3.2 and add release notes
2026-10-27 00:42:56 -0400
1b45bdc feat(broadcast): dispatch Email #14 live to family, capture screenshots, and add Leningrad banner
2026-10-27 00:42:42 -0400
939812f feat(art): generate Soviet constructivist posters for Arkhangelsk and Lake Onega
2026-10-27 00:38:17 -0400
cd3c774 feat(branding): add custom Soviet constructivist banner for Email #14 (Vologda / Totma) and update cost ledger
2026-10-27 00:31:54 -0400
d6eec90 feat(broadcast): dispatch Email #13 from email-v5 with apology note, corrected timing and Option 3 poster
2026-10-27 00:27:03 -0400
80d68b9 Merge pull request #6 from ktalanov/feat/elevated-input-prompts-and-acknowledgments
2026-10-26T20:01:54Z
40af184 fix(bridge): screen sensitive credentials in receipts and enforce restricted input scope
2026-10-26T20:01:17Z
6c9c30c feat(bridge): elevated input prompt options, verbatim chat echoing, and subject acknowledgments
2026-10-26T19:46:30Z
fcb1be8 Merge pull request #4 from ktalanov/fix/single-shot-bridge-listener
2026-10-26T19:40:16Z
96c1b8b feat(broadcast): dispatch Email #12 live to family, update dashboard and screenshots
2026-10-26 23:42:19 -0400
acccd4a feat(branding): harmonize all emails with unified PingWing footer banner linking to igloointeractive.ca
2026-10-26 23:33:35 -0400
1da1c5b feat(broadcast): dispatch Email #11 live to family, update dashboard and screenshots
2026-10-26 23:14:12 -0400
0f125ec feat(broadcast): dispatch Email #10 live to family, update dashboard and screenshots
2026-10-26 22:41:38 -0400
9fb0d6f docs(report): add Kemerovo historical dossier for Kirill's mother (igloo-report)
2026-10-26 22:18:29 -0400
7b7da5d feat(broadcast): dispatch Email #09 live to family, update dashboard and screenshots
2026-10-26 22:11:32 -0400
17462f5 feat(footer): inject PingWing branded footer into en-route emails 09-19
2026-10-26 21:54:22 -0400
1a67264 feat(broadcast): dispatch Email #08 live to family, update dashboard and screenshots
2026-10-26 21:46:35 -0400
97d0396 chore(git): update notifications_sent pattern in gitignore
2026-10-26 21:43:31 -0400
fa33c9a feat(footer): update footer layout to use pingwing1 logo and igloo social card with flexible divider
2026-10-26 21:42:22 -0400
4584d95 docs(screenshots): add full email renders and dispatcher dashboard captures
2026-10-26 21:30:18 -0400
14bc44d feat(core): initialize PingWing aviation storytelling platform & Flight N4-318 pipeline
2026-10-26 21:26:53 -0400
0209ec2 docs(plan): track cross-model sync receipts
2026-10-26 20:02:56 -0400
abc3d2c docs: document dual sync issues and separate main vs internal IVR scopes
2026-10-26 13:18:13 -0400
a3bb897 test(receipt): add live end-to-end ntfy.sh message dispatch and receipt verification test
2026-10-25T22:59:32Z
316b8b8 fix(bridge): add single-shot relay mode to resolve ingestion deadlock
2026-10-25T22:57:53Z
03d6bba feat(sms): add bidirectional Twilio SMS bridge and polling runner
2026-10-25T22:52:49Z
040559a feat(v0.3.0): topic generator, zero-token invariants, and security protocol
2026-10-25T22:51:23Z
4eb30bc fix(docs): reconcile 4.3.1 release, newcomer journey, and syntax QA hardening (#16, #17)
2026-10-25 22:54:43 -0400
32106d9 Merge pull request #15 from ktalanov/codex/pr13-automated-review-fixes
2026-10-25 15:46:24 -0400
bd820f5 docs(release): prepare 4.3.1 publication notes and acceptance record
2026-10-25 15:38:29 -0400
c9ff847 docs: reconcile 4.3.1 review fixes and verification boundaries
2026-10-25 11:05:50 -0400
f38d4d9 fix(notifications): preserve approved lifetime and resolve recurring briefs
2026-10-25 11:04:27 -0400
fe5f33a Merge pull request #13 from ktalanov/codex/igloo-release-4.3.0
2026-10-25 06:42:21 -0400
ef25ebc docs(ivr): add comprehensive system overview and enforce email routing policies
2026-10-25 06:32:38 -0400
8bb86f7 fix(notifications): replace local mail/esmtp with Resend API for lead notifications
2026-10-25 06:13:57 -0400
5b9a808 fix(sms): enable lead intake testing for owner, sync ladder state, and fix GUI terminal launcher
2026-10-25 06:07:54 -0400
Chronological Ledger (Newest First)
Talanov's Codex Sessions (2026-10-20 → 2026-10-27)
Filter by project, thread state, or conclusion status, or search across topics, shipped outcomes, and next actions.
Showing 22 of 22 conversations.
| Date / Time | Project | Topic | Thread State | Concluded? | What Talanov Worked On Using Codex | Unfinished / Next | Delegated Subagents |
|---|---|---|---|---|---|---|---|
| 2026-10-27 12:45 EDT | Codex Config / Reports | AI Passport refresh & 24-10-2026 report recreation | Active | Yes Passport GitHub read access verified; 24-Oct report refreshed. |
Talanov verified with Codex that AI Passport holds an active permanent pass for github-private / projects.items, saved 2026-10-27-passport-evidence.json, and updated the 24-10-2026 report suite with live issue/PR states. | Expand the report suite to 10 projects for the Oct 20–27 window with 3-container Changelogs and interactive hover tooltips (this 27-10-20 suite). | 4 |
| 2026-10-27 11:38 EDT | Igloo v2 | Release 4.3.2 docs reconciliation & syntax QA (#16, #17, PR #18) | Active | Yes PR #18 merged; Issues #16 & #17 closed; themes added at 06974f7. |
Talanov used Codex to add authoring-stage syntax QA proofreading to igloo-create (#17), restructure the README newcomer journey (#16), merge PR #18 for v4.3.2, and add Midnight Observatory and Lush Forest report themes (06974f7). | Push commit 06974f7 and complete the bundled assets/themes/ migration. | 4 |
| 2026-10-27 09:20 EDT | Igloo v2 | Igloo-overview & ntfy/SMS inbound routing boundary check | Active | No Paused at inbound SMS/ntfy routing boundary check. |
Talanov ran an igloo-overview check and tested messaging integration boundaries before transitioning to the 4.3.2 documentation and theme slice. | Wire single-shot relay hooks from igloo-notify into opt-in notification configs. | 5 |
| 2026-10-27 06:56 EDT | Bark | Slice 0.2.5 blind STT comparison shootout & recovery CLI delivery | Active | Yes 0.2.5 implementation & 112 offline checks completed at de33220. |
Talanov worked with Codex (and 15 delegated subagent turns) to build Bark 0.2.5: blind transcription comparison UI, deterministic noisy speech scoring, exact billing liability guards, and a budget recovery CLI on codex/stt-comparison. | Open/merge the PR for codex/stt-comparison (de33220) and select 0.2.4 install guide or Issue #10 bark-sentry. | 15 |
| 2026-10-27 03:15 EDT | PingWing | Flight N4-318 storytelling pipeline, Constructivist posters & Ghost Flight errata | Active | Yes Emails #08–#15 + ERRATA #999/#1000 & Asimov penance dispatched. |
Talanov built the PingWing aviation storytelling platform (25 commits), generated 8 Soviet Constructivist regional posters ($0.088 total), deployed a T-3min Russian factual verification daemon, and resolved a timezone 'Ghost Flight' incident with humorous corporate apology broadcasts tracked in Issue #1 (21 comments). | Implement the 10-minute pre-broadcast web staging dashboard (:8318) and live ADS-B departure lock. | 6 |
| 2026-10-26 20:05 EDT | Igloo-Notify & Halp | Single-shot relay fix (PR #4) & elevated prompt/echoing options (PR #6) | Active | Yes PRs #4 & #6 merged; Issues #1, #2, #3, #5 closed. |
Talanov resolved background daemon ingestion deadlocks using --once single-shot relay mode (PR #4) and added two-stage input scope prompts, verbatim SMS chat echoing, subject auto-acks, and credential screening (PR #6). | Integrate single-shot relay verification with multi-channel fallback (ntfy -> SMS). | 4 |
| 2026-10-26 14:57 EDT | Bark | 0.2.5 STT model shootout plan & OpenRouter STT catalog setup | Active | Yes Comparison plan recorded and STT models configured. |
Talanov scoped the 0.2.5 multi-model speech-to-text comparison shootout in bark/plans/0.2.5-comparison.md and configured OpenRouter STT model catalog options prior to full implementation. | Completed in the follow-on 2026-10-27 06:56 EDT implementation thread. | 17 |
| 2026-10-25 23:58 EDT | IVR & Callvex | Callvex stress engine (#23), outbound AMD/SMS (#21/#22), PR #25 & dual sync (#26/#27) | Active | Yes PR #25 merged; Issues #21–#24 closed; dual sync #26/#27 active. |
Talanov delivered outbound AMD voice follow-ups (#21), 3-turn SMS lead intake (#22), the Callvex 7-scenario acoustic stress-testing engine (#23), Resend API email dispatch (8bb86f7), CLI signature fixes (PR #25), and dual standing sync issues (#26 & #27). | Advance voice-bridge (Issue #20) and approve Phase 10 staging worksheet for ivr/. | 6 |
| 2026-10-25 22:58 EDT | Dashdia | Dashdia vs. Dasher strategic focus decision | Active | Yes Decision concluded: prioritize Dashdia and park Dasher. |
Talanov evaluated the overlap between Dasher and Dashdia with Codex, deciding to focus engineering effort on Dashdia's execution board and independent business/founder evaluation slice (0.2.11) while parking Dasher. | Implement Dashdia slice 0.2.11 on branch codex/business-assessments-0.2.11 (PR #4). | 0 |
| 2026-10-25 16:40 EDT | Igloo v2 | Release 4.3.0 & 4.3.1: Bounded notifications, briefs & release skills (PR #13, #15) | Active | Yes PRs #13 and #15 merged; Issue #12 closed. |
Talanov implemented and merged Igloo 4.3.0 (PR #13) adding bounded ntfy/Twilio notifications, recurring briefs, and igloo-release, followed immediately by 4.3.1 (PR #15) enforcing 60-day notification lifetimes and current-period brief selection. | Followed by 4.3.2 documentation reconciliation and syntax QA in PR #18. | 14 |
| 2026-10-25 02:45 EDT | JustTheTips | Release v0.15.0–v0.16.0: 60s telemetry pipeline, multi-scale charts & collapsible sidebar (PR #9) | Active | Yes PR #9 merged; 8 issues (#1, #3–#8, #10) closed; 67 smoke tests pass. |
Talanov shipped JTT v0.15.0 (Twilio master reference), v0.15.1 (Taskboard runner & timer consolidation), and v0.16.0 (PR #9: 60s swapinfo SQLite telemetry pipeline, 5-scale Chart.js toolbar, and default-collapsed sidebar categories). | Scope v0.17.0 client-side full-text search across all 150+ sysadmin guides. | 8 |
| 2026-10-24 11:36 EDT | Bark | Release v0.2.1/0.2.2 financial ledger & live 5-model USB mic shootout (PR #7) | Active | Yes PR #7 merged; live hardware shootout recorded ($0.0039 total). |
Talanov built LEDGER.md, added debug logging, ran a live 5-model STT shootout on physical USB microphone hardware ($0.0039 total spend), merged PR #7, and authored Issue #10 (bark-sentry Acoustic Sentry RFC). | Led directly into Slice 0.2.5 blind transcription comparison & benchmark suite. | 11 |
| 2026-10-24 10:57 EDT | Talanov.ca | Voice rewrite (PR #11), Homepage/About copy update & 700-line prune (6f97b4c) | Active | Yes PR #11 merged; commit 6f97b4c on dev; candidate copy staged. |
Following the merge of PR #11 establishing Talanov's documented voice rulebooks, Talanov updated Homepage and About copy, pruned 700+ lines of obsolete backups/reports (6f97b4c), and drafted the interactive site reboot concept in a_new_site.md. | Review tmp/candidate-for-site-copy-replacement.html and merge dev into main. | 2 |
| 2026-10-24 00:30 EDT | Dashdia | 0.2.10 Report Library merge (PR #3) & 0.2.11 assessment scope (PR #4) | Archived | No 0.2.10 merged via PR #3; 0.2.11 plan frozen in draft PR #4. |
Talanov merged 0.2.10 (Report Library, schema 8 migration, 22-section export) via PR #3 (21 comments), reconciled docs, and opened draft PR #4 with a frozen plan and passing feasibility check for 0.2.11. | Implement the selected 0.2.11 business & founder assessment slice, then stop. | 18 |
| 2026-10-23 02:52 EDT | Igloo v2 | Audit & reconcile 4.2.0 (PR #8) and 4.2.1 (PR #10) releases | Active | Yes Superseded and resolved by 4.3.0–4.3.2 release reconciliation (PRs #13, #15, #18). |
Talanov audited the 4.2.0 cross-model sync release (PR #8, 46 review items) and 4.2.1 security audit repairs (PR #10), aligning local main checkout state before launching the 4.3.x release series. | Resolved in subsequent 4.3.0 / 4.3.2 release PRs (#13, #15, #18). | 31 |
| 2026-10-23 02:47 EDT | Igloo v2 | Publish-only igloo-release skill design | Active | Yes Design approved and subsequently delivered in PR #13 (v4.3.0). |
Talanov designed and approved the publish-only igloo-release skill separating remote release publication from local installation, which was then shipped in PR #13 (v4.3.0). | Delivered in Igloo 4.3.0 (PR #13). | 0 |
| 2026-10-22 23:40 EDT | Igloo v2 | Quick Q&A on Igloo workflow skills | Active | Yes Concluded as a workflow Q&A. |
Talanov reviewed the Igloo v2 skill suite from the halp workspace to verify skill boundaries before running multi-slice orchestrations. | No implementation follow-up required. | 0 |
| 2026-10-22 06:36 EDT | Bark | 0.2.1 catalog/settings implementation & v0.2.0 publication | Active | Yes Implementation, GTK acceptance & v0.2.0 release readback completed. |
Talanov implemented explicit-refresh OpenRouter model discovery, persisted exact selected models, completed guided GTK acceptance and independent reviews, and verified v0.2.0 release readback (cost displays: 0.03¢/sample, 0.15¢/min, $0.09/hr). | Followed by PR #7 (v0.2.1 financials/shootout) and Slice 0.2.5 STT comparison. | 9 |
| 2026-10-21 06:47 EDT | Dashdia | 0.2.8 Daily Focus board prioritization & delivery | Active | Yes 0.2.8 Focus board delivered, reviewed, and pushed. |
Talanov reordered the Dashdia roadmap around practical daily execution and delivered the 0.2.8 Focus board loop: choose work, pin it, write the next action, change status, reload/resume, and finish. | Followed by 0.2.9 Decision Workspaces, 0.2.10 Report Library (PR #3), and 0.2.11 (PR #4). | 23 |
| 2026-10-20 19:57 EDT | IVR & Callvex | Phase 10 staging approval worksheet & PR #18 serverless prep | Active | Yes Concluded as a safe blocker handoff (PHASE10.md DRAFT). |
Talanov and Codex created the fillable PHASE10.md staging approval worksheet marked DRAFT / NOT APPROVED at 00905bf so no unapproved live provider mutation occurred on the commercial control plane. | Populate and approve PHASE10.md before commercial staging; internal serverless IVR shipped via PR #18 & #25. | 2 |
| 2026-10-20 15:15 EDT | Ortui | PR #20 Account Dashboard & Go SDK attribution/status handoff | Active | Yes Docs & attribution repaired at 7aacb2d; CI & dual reviews passed. |
Talanov completed the documentation and lifecycle attribution repair at 7aacb2d for PR #20 (Account Dashboard + Go Client SDK v0.9.61 catalog mode, 64 comments), leaving the v0.6.0 candidate ready for merge decision. | Authorize merge of PR #20 and tag v0.6.0 before starting v0.7.0 UI/UX work. | 16 |
| 2026-10-20 10:30 EDT | AskAI | Remove intercepting AskAI shell alias & verify launchers | Active | Yes Alias cleanup concluded and launchers verified. |
Talanov removed the conflicting shell alias that intercepted the askai launcher and verified that both askai and ,askai launch the v0.1.0 Charm Gum wizard cleanly. | Select a v0.2.0 feature slice (live OpenRouter catalog or preset history) when resuming AskAI. | 0 |
Repository Telemetry
10-Project (+ Config) Local Checkout Snapshots
| Rank & Project | Business Viability | Local Path | Branch / HEAD / Worktree | 7-Day Oct 20–27 Telemetry | Highest-Value Next Slice |
|---|---|---|---|---|---|
| #1 Dashdia | 92/100 (Tier-1 Flagship SaaS) | /home/lenin/github/dashdia |
codex/business-assessments-0.2.11 @ a13a068Clean · upstream 0 ahead / 0 behind |
2 PRs 1 Issues 16 Commits | Implement slice 0.2.11 ('Assess business merit and founder feasibility independently') staged in draft PR #4: private founder profile (/api/founder-profile), independent weighted BA & founder fit scoring (0–5), isolated stale-aware sales scenarios, and legal/prerequisite blocker flags. |
| #2 IVR & Callvex | 96/100 (Tier-1 B2B Telephony) | /home/lenin/github/igloonetworks.com |
igloo-default-ivr @ d85fab9Dirty (2 modified / untracked voice-bridge/) · ahead 2 |
2 PRs 8 Issues 24 Commits | Advance voice-bridge ('Glacier Line', Issue #20) from v0.1.0 pre-alpha scaffold toward live PSTN command bridging, and complete the populated Phase 10 staging approval worksheet for the commercial ivr/ control plane. |
| #3 Bark | 89/100 (High-Velocity Product) | /home/lenin/github/bark |
codex/stt-comparison @ de33220Clean · upstream 0 ahead / 0 behind (51 commits in 7d) |
1 PRs 11 Issues 51 Commits | Merge the verified 0.2.5 blind STT comparison and budget-recovery branch (codex/stt-comparison @ de33220), then select between the v0.2.4 desktop installation guide and prototyping Issue #10 (bark-sentry decibel-threshold intruder alerting). |
| #4 Igloo v2 | 90/100 (Core Agent Platform) | /home/lenin/github/igloo-v2 |
main @ 06974f7Dirty (1 untracked file) · ahead 1 (46 commits in 7d) |
6 PRs 6 Issues 46 Commits | Push commit 06974f7 (Midnight Observatory and Lush Forest report themes), complete bundled assets/themes/ migration, and resolve open Issues #9 (custom output directory hub labels) and #11 ([CLOSED BY MODEL] sync suffix). |
| #5 PingWing | 94/100 (Breakout Consumer/VIP) | /home/lenin/github/pingwing |
main @ 50c6326Dirty (4 modified/untracked v5 email scripts) · ahead 4 |
0 PRs 1 Issues 25 Commits | Build the 10-minute pre-broadcast web staging and human-approval dashboard (:8318), enforce single-source temporal state locks across Subject/Badge/Body, and require live ADS-B airborne verification before departure dispatches. |
| #6 JustTheTips | 84/100 (Authority & Ops Hub) | /home/lenin/github/justthetips |
main @ 5f1dcddDirty (7 compiled HTML/daily model snapshots) · upstream 0/0 |
1 PRs 9 Issues 19 Commits | Deliver v0.17.0 featuring client-side full-text search across all 150+ TIPS guides, automated SQLite telemetry downsampling, and ongoing cross-model sync tracking in Issue #2. |
| #7 Ortui | 85/100 (Dev Tooling Suite) | /home/lenin/github/ortui |
codex/ortui-parallel-slices @ 7aacb2dClean tracked files (1 untracked dir oct13-ortui) · upstream 0/0 |
1 PRs 1 Issues 1 Commits | Authorize merge of PR #20 into main and tag pre-release v0.6.0, then proceed to planned v0.7.0 UI/UX refinements and Issue #22 (official Go Client/Agent SDK surface alignment). |
| #8 Igloo-Notify & Halp | 86/100 (Agent Ops Bridge) | /home/lenin/github/halp |
master (igloo-notify) / 001-10-26 (halp) @ 80d68b9 (notify) / e3ce443 (halp)igloo-notify: Clean · halp: Dirty (15 workspace files) |
2 PRs 4 Issues 12 Commits | Wire igloo-notify single-shot relay hooks into Igloo v2's opt-in notification config, and add optional Twilio webhook signature validation for direct inbound SMS relays. |
| #9 Talanov.ca | 87/100 (Consulting Funnel) | /home/lenin/github/talanov.ca |
dev @ 6f97b4cDirty (1 untracked blueprint a_new_site.md) · ahead 4 / behind 6 |
1 PRs 0 Issues 1 Commits | Finalize review of tmp/candidate-for-site-copy-replacement.html and the interactive retro-boot sequence in a_new_site.md, reconcile dev with main, and deploy. |
| #10 AskAI | 76/100 (CLI Utility) | /home/lenin/github/askai |
main @ 91efffaDirty (modified CONVOS.md, untracked .ori/ — preserve) |
0 PRs 0 Issues 0 Commits | Select and scope a v0.2.0 feature slice from PLAN.md: live OpenRouter model intelligence, categorized preset management (~/.config/askai/presets.json), or execution history. |
| #11 Codex Config | 82/100 (Governance Layer) | /home/lenin/.codex/AGENTS.md |
Local configuration (~/.codex/AGENTS.md) @ 21,563 bytes (Oct 27)Active local policy + verified AI Passport permanent GitHub pass |
0 PRs 0 Issues 0 Commits | Keep ~/.codex/AGENTS.md, ~/.gemini/config/, and repository AGENTS.md files synchronized as new skills and themes are added. |