Project Report #11 • What did Talanov work on using Codex? • 2026-10-20 → 2026-10-27

Codex Config — Global subagent model routing, skill transparency & AI Passport loop.

Updated ~/.codex/AGENTS.md through Oct 27 (Sections 11–14: flash/flash_lite subagent routing, real-time status styling, skill attribution, and $HOME/github/themes/ library) and verified AI Passport GitHub read access.

Rank #11Viability: 82/100 (Governance Layer)
1 Main ThreadsCodex sessions in Oct 20–27 window
0 Pull Requests0 merged, 0 open/draft
0 GitHub Issues0 closed, 0 open
0 Git CommitsSince 2026-10-20 on Local configuration (~/.codex/AGENTS.md)

Mission & Commercial Positioning

What Codex Config Is

Governs global behavior, privilege boundaries (pkexec over sudo), worktree safety, Conventional Commits, AI Passport owner-review memory/connector workflows, and subagent token economics across Codex, Antigravity, and Crush sessions on leninlab.

Commercial Rationale (82/100)

Global operating constitution enforcing subagent token economics, worktree safety, and AI Passport owner-review loops.

Current Milestone (As of Oct 27)

Updated /home/lenin/.codex/AGENTS.md on 2026-10-27 12:15 EDT (21,563 bytes) codifying Section 11 (Subagent Model Routing: flash_lite for discovery, flash for summarization/drafting, pro/inherit for lead orchestration), Section 12 (In-the-Moment Markdown Progress Updates), Section 13 (Immediate Skill Activation Notices), and Section 14 (Report & Website Themes at $HOME/github/themes/). Also verified on Oct 27 that AI Passport holds an active permanent pass for github-private / projects.items.

Next Slice: Keep ~/.codex/AGENTS.md, ~/.gemini/config/, and repository AGENTS.md files synchronized as new

Local Checkout & Recent Work Summary

Checkout Snapshot & Recent Work

  • Local Path: /home/lenin/.codex/AGENTS.md
  • GitHub Repo: Local host configuration
  • Active Branch / HEAD: Local configuration (~/.codex/AGENTS.md) @ 21,563 bytes (Oct 27)
  • Worktree Status: Active local policy + verified AI Passport permanent GitHub pass
Recent Work (Oct 20 – Oct 27 Summary)
  • Updated ~/.codex/AGENTS.md (Oct 27 12:15 EDT) with Sections 11–14: Subagent token routing, structured mid-task progress updates, skill activation transparency, and shared theme gallery rules.
  • Verified AI Passport private GitHub connector read access on Oct 27 (2026-10-27-passport-evidence.json) and refreshed the 24-Oct baseline report.
  • Enforced British banter pair-programming persona and strict worktree preservation invariants across all harnesses.

7-Day GitHub & Git Activity (2026-10-20 → 2026-10-27)

Changelog: Pull Requests, Issues & Commits

Three-container breakdown of every Pull Request, GitHub Issue, and Git Commit / CHANGELOG entry recorded for Codex Config over the past seven days.

1. Pull Requests

0 PRs
0 Pull Requests in Oct 20–27 window Direct / Local Workflow

All engineering changes for Codex Config during Oct 20–27 were committed directly to the active branch or verified locally without opening a separate GitHub Pull Request in this 7-day window.

2. GitHub Issues

0 Issues
0 GitHub Issues in Oct 20–27 window Tracked in PLAN.md / CHANGELOG.md

Task slices and acceptance criteria for Codex Config were tracked directly inside repository planning files during Oct 20–27.

3. Commits & Changelogs

0 Commits
CHANGELOG.md / Release Highlights 2 entries
  • 2026-10-27 12:15 EDT: Updated ~/.codex/AGENTS.md adding Sections 12 (Real-Time Status Transparency), 13 (Skill Activation Attribution), and 14 (Report Themes).
  • 2026-10-27 09:55 EDT: Verified AI Passport permanent pass for github-private / projects.items and saved 2026-10-27-passport-evidence.json.

Project Conversation Ledger

Talanov's Codex Sessions for Codex Config (Oct 20 – Oct 27)

Date / Time Topic Thread State Concluded? What Talanov Worked On Using Codex Unfinished / Next Delegated Subagents
2026-10-27 12:45 EDT AI Passport refresh & 24-10-2026 report recreation Active Yes
Passport GitHub read access verified; 24-Oct report refreshed.
Talanov verified with Codex that AI Passport holds an active permanent pass for github-private / projects.items, saved 2026-10-27-passport-evidence.json, and updated the 24-10-2026 report suite with live issue/PR states. Expand the report suite to 10 projects for the Oct 20–27 window with 3-container Changelogs and interactive hover tooltips (this 27-10-20 suite). 4

Cross-Project Navigation

Jump to Another Project in the 10-Project Suite